Service Areas
Builders in Cheltenham, Mentone and Mordialloc
Oakview Homes builds knockdown rebuilds and new homes in Cheltenham, Mentone, Mordialloc and the rest of the City of Kingston, along the bay between Melbourne’s south-east and our rebuild in Seaford.
Our nearest job is the knockdown rebuild in Seaford, just down the Nepean Highway, where you can follow the build stage by stage.
Which suburbs do we cover?
Across the City of Kingston, including:
- Cheltenham
- Mentone
- Mordialloc
- Parkdale
- Aspendale
- Chelsea
- Edithvale
- Dingley Village
- Clayton South
What is building in Cheltenham, Mentone and Mordialloc like?
Kingston runs along the bay from Mentone and Mordialloc down to Chelsea and Edithvale, with Cheltenham and Dingley Village inland. These are established suburbs, and an older home on a full-size block here can become a new one without leaving the street.
Planning applications here go to the City of Kingston (kingston.vic.gov.au); the building permit comes from a registered building surveyor.
What can Oakview build in Cheltenham, Mentone and Mordialloc?
- Knockdown rebuilds on established blocks in Cheltenham, Mentone and Parkdale.
- New single-storey and custom homes on the blocks that come up after a subdivision.
- Side-by-side homes on wider blocks: coming soon.
Rebuilding in Kingston?
- Homes built before the 1990s can contain asbestos, which a licensed removalist takes out before demolition.
- Planning overlays (heritage, vegetation, flooding) are on your property report from VicPlan; send us the address and we will look.
- Two or more homes on one lot need a planning permit from the council.
- A soil test and a feature and level survey set the slab design and show site costs early.
For a first idea of price, try our rough cost guide, or call 03 8658 7000.
Where else nearby do we build?
Down the Nepean Highway we also build in Frankston and Seaford; inland, in Dandenong and Keysborough and Clayton, Glen Waverley and Knox. Older home near the end of its life? Our knockdown rebuild page covers demolition to handover.
Or see every area we build in.
How do you start?
- Send us the address: we look at the block, the title and the planning overlays.
- We plan the demolition and the new home together, and quote both.
- Once you sign, the permits are applied for: demolition, building and planning if needed.
- The old house comes down, then the new one goes up stage by stage to handover.
Got a question about building with us?
Find answers about building with Oakview.